1. Electrical
Design, Drawings, and Schedules development.
Commercial & Industrial
2. Solar System
Off-Grid and Grid-Tie System Design, Drawings, and Schedules development.
Residential, Commercial & Industrial
3. Fire Suppression
Restaurant Fire Suppression System Design, Drawings, and Schedules development. Engineer Verification Letter (VI)
4. Fire Alarm
Design, Drawings, and Schedules development.
Engineer Verification Letter (VI)
In every project there's a line from the beginning to the end. Tri-Tek Engineering's entire philosophy is to be prepared and to make that line as short and straight as it can be.
Founded in 1911, SNC-Lavalin is one of the leading engineering and construction groups in the world and a major player in the ownership of infrastructure. From offices in over 50 countries, SNC-Lavalin's approximately 45,000 employees provide EPC and EPCM