Filters
We didn’t find “East-Coast-R-R” in “New Tecumseth ON”. Below are results for "east coast air".

east coast air near New Tecumseth ON (101 Result(s))

Specializing in Window, Through The Wall & Split Ductless A/C. We will service & install your OWN A/C.
Barbara Paull is a British trained physiotherapist and a member of the Chartered Society of Physiotherapy, UK. She immigrated to Canada in 1967 and has concentrated upon orthopaedic physiotherapy practice and post-graduate education for over forty years. She is an active member of the Ontario Physiotherapy Association. In 1985 Barbara left her position as Director of Physiotherapy at York County Hospital (now Southlake Regional Hospital) in Newmarket, to open this private clinic. In 1992 she opened a second clinic dedicated to injured musicians. www.stouffvillemusiciansinjuriesclinic.ca. Barbara has designed and established on-site clinics in local industries, where physiotherapists provide ergonomic consultations and care for injured workers. In 2000 Barbara received the OPA’s Recognition Award for outstanding achievements in Professional Contribution and, in 2005 the Award of Distinction from the College of Physiotherapists of Ontario.
Originally started in 1958 in Newmarket Ontario and has been in the drilling industry ever since. It’s been a family-run business with three generations working side by side, to make a well-diverse corporation willing to take on the challenges of the future. Lone Star Drilling has had the pleasure of working with some of the biggest engineering companies around the globe such as Strabag Inc. on the OPG project in Niagara Falls, Ellis Don, PCL, McNally Eng. and most of the big elevator companies for hydraulic elevator shafts which require a straight hole. We have had the pleasure of drilling air vent shafts and alignment holes throughout Ontario and elevator shafts from coast to coast. Ventilation shafts 36” in diameter 425 feet deep in the rock and countless 12” holes throughout Niagara Falls for the Sir Adam Bec Tunnel, Strabag Inc. Tunnel alignment holes for the 410 Hwy project, 20” casing into rock to the tunnel. Greater Sudbury Sewer drop holes lined with 12” stainless steel pipe.
Go to Merchant Page
Get Directions
Close menu